{"id":9385,"date":"2025-09-15T16:52:04","date_gmt":"2025-09-15T16:52:04","guid":{"rendered":"https:\/\/th-a.com\/die-fertigstellun\/"},"modified":"2025-10-16T18:04:51","modified_gmt":"2025-10-16T18:04:51","slug":"final-steps","status":"publish","type":"post","link":"https:\/\/th-a.com\/en\/final-steps\/","title":{"rendered":"FINAL STEPS"},"content":{"rendered":"<h1><strong>Final Steps in the Construction Process<\/strong><\/h1>\n<h2>From Reception to Registration in the Land Registry<\/h2>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"postimg alignnone wp-image-9162 size-full\" src=\"https:\/\/th-a.com\/wp-content\/uploads\/2025\/09\/07.-building-licence-mallorca-tarragona-hohne-architects.jpg-1536x512-1.jpg\" alt=\"\" width=\"1920\" height=\"640\" \/><\/p>\n<p>With the completion of construction, the most important phase has been achieved, but before the new house in Mallorca can be officially occupied, several administrative and legal procedures must be completed. These ensure not only the legality of use but also full protection of ownership rights.<\/p>\n<ol>\n<li><strong> Acta de Recepci\u00f3n \u2013 Site Handover Protocol<\/strong><\/li>\n<\/ol>\n<p>Once the construction works are finished, the <strong>Direcci\u00f3n Facultativa de la Obra (DFO \u2013 Technical Site Management)<\/strong> \u2014comprising the <strong>Director de Obra (Lead Architect)<\/strong> and the <strong>Director de la Ejecuci\u00f3n de la Obra (Technical Architect \/ Aparejador)<\/strong>\u2014 signs the <strong>Acta de Recepci\u00f3n (Site Handover Protocol)<\/strong> together with the contractors.<\/p>\n<p>This document formally confirms the completion of the building and marks:<\/p>\n<ul>\n<li>The beginning of the statutory warranty periods.<\/li>\n<li>The commencement of the deadlines for possible defect rectifications.<\/li>\n<\/ul>\n<ol start=\"2\">\n<li><strong> Certificado Final de Obra (CFO \u2013 Final Works Certificate)<\/strong><\/li>\n<\/ol>\n<p>Following reception, the DFO issues the <strong>Certificado Final de Obra (CFO)<\/strong>, which certifies that:<\/p>\n<ul>\n<li>The works have been completed and the building is fully finished.<\/li>\n<li>Construction has been carried out in accordance with the approved and COAIB-stamped project, the granted licences, and applicable regulations.<\/li>\n<\/ul>\n<p>The CFO must be stamped by the <strong>COAIB \u2013 Colegio Oficial de Arquitectos de las Islas Baleares<\/strong> and is an indispensable requirement for subsequent procedures.<\/p>\n<ol start=\"3\">\n<li><strong> Licencia de Primera Ocupaci\u00f3n (LPO \u2013 First Occupancy Licence)<\/strong><\/li>\n<\/ol>\n<p>With the CFO, the <strong>Licencia de Primera Ocupaci\u00f3n (LPO)<\/strong> is applied for at the relevant municipality.<\/p>\n<p><strong>Typical documentation:<\/strong><\/p>\n<ul>\n<li>Final Works Certificate (CFO).<\/li>\n<li>Final safety element certificates (railings, glazing, fire doors, etc.).<\/li>\n<li>Certificates of installations (lifts, gas, electricity, etc.).<\/li>\n<li><em>As built<\/em> drawings, including planting plans required in certain municipalities.<\/li>\n<\/ul>\n<p><strong>Procedure:<\/strong><\/p>\n<ol>\n<li>Review of documentation by the municipality.<\/li>\n<li>On-site inspection by municipal technicians.<\/li>\n<li>Granting of the LPO.<\/li>\n<\/ol>\n<p><strong>Important notes:<\/strong><\/p>\n<ul>\n<li>Increasingly, municipalities require verification of the declared costs (<strong>PEM \u2013 Presupuesto de Ejecuci\u00f3n Material<\/strong>) against actual invoices, applying a surcharge of the <strong>ICO tax<\/strong> if discrepancies are found.<\/li>\n<li>According to <strong>Law 3\/2024 (Illes Balears, BOIB No. 61, 9 May 2024)<\/strong>, the <strong>C\u00e9dula de Habitabilidad (Habitability Certificate)<\/strong> is no longer required for new construction: the LPO replaces it and is sufficient to contract utilities. For older buildings, the procedures for obtaining or renewing the c\u00e9dula remain in place.<\/li>\n<\/ul>\n<ol start=\"4\">\n<li><strong> Technical Certificates and Energy Performance Certificate (EPC)<\/strong><\/li>\n<\/ol>\n<p>With the LPO and installation certificates, definitive utility connections can be contracted.<\/p>\n<p><strong>Required documentation:<\/strong><\/p>\n<ul>\n<li>Installation certificates (gas, electricity, water, telecoms, etc.).<\/li>\n<li>Definitive <strong>Energy Performance Certificate (EPC \u2013 Certificado de Eficiencia Energ\u00e9tica, CEE)<\/strong>.<\/li>\n<li>Registration of the EPC with the <strong>Direcci\u00f3n General de Energ\u00eda y Cambio Clim\u00e1tico (Balearic Government)<\/strong>.<\/li>\n<\/ul>\n<ol start=\"5\">\n<li><strong> Libro del Edificio \u2013 Building Book<\/strong><\/li>\n<\/ol>\n<p>The <strong>Libro del Edificio (Building Book)<\/strong> must include:<\/p>\n<ul>\n<li>Building drawings.<\/li>\n<li>User and maintenance manuals.<\/li>\n<li>Technical certificates and warranties.<\/li>\n<li>Details of the companies and professionals involved.<\/li>\n<\/ul>\n<p>It must be delivered in digital format and is mandatory for the <strong>Escritura de Obra Nueva (Deed of New Construction)<\/strong>. It is prepared by the architect.<\/p>\n<ol start=\"6\">\n<li><strong> Georeferenced Topographic Survey and Cadastre<\/strong><\/li>\n<\/ol>\n<p>After completion, a <strong>Georeferenced Topographic Survey (Estudio Topogr\u00e1fico Georreferenciado)<\/strong> of the building within the plot is required as the basis for:<\/p>\n<ul>\n<li>Updating the <strong>Catastro (Cadastre)<\/strong>.<\/li>\n<li>Registration before a notary for the declaration of new construction.<\/li>\n<\/ul>\n<p>This procedure is coordinated by the architect.<\/p>\n<ol start=\"7\">\n<li><strong> Escritura de Obra Nueva \u2013 Notarial Deed of New Construction<\/strong><\/li>\n<\/ol>\n<p>For the <strong>Escritura de Obra Nueva<\/strong>, the following documents are required:<\/p>\n<ul>\n<li>Final Works Certificate (CFO).<\/li>\n<li>First Occupancy Licence (LPO).<\/li>\n<li>Building Book.<\/li>\n<li>Georeferenced Topographic Survey.<\/li>\n<li>Registered Energy Performance Certificate (EPC).<\/li>\n<li>Technical installation certificates.<\/li>\n<\/ul>\n<p>The notary, in collaboration with the architect, formalises the declaration and the deed.<\/p>\n<ol start=\"8\">\n<li><strong> Registration in the Land Registry<\/strong><\/li>\n<\/ol>\n<p>With the notarial <strong>Escritura de Obra Nueva<\/strong>, the property is entered into the <strong>Registro de la Propiedad (Land Registry)<\/strong>, legally establishing full ownership rights.<\/p>\n<p><strong>Conclusion<\/strong><\/p>\n<p>The process from construction completion to registration in Mallorca begins with the <strong>Acta de Recepci\u00f3n<\/strong>, which activates warranty periods. From there, the technical documents and municipal authorisations ensure the transition from construction to a legally habitable and fully registered property.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Final Steps in the Construction Process From Reception to Registration in the Land Registry With the completion of construction, the most important phase has been achieved, but before the new&#8230;<\/p>\n","protected":false},"author":1,"featured_media":8154,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[45],"tags":[],"class_list":{"0":"post-9385","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-administrative-procedures"},"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"Final Steps in the Construction Process From Reception to Registration in the Land Registry With the completion of construction, the most important phase has been achieved, but before the new house in Mallorca can be officially occupied, several administrative and legal procedures must be completed. These ensure not only the legality of use but also\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"jotaele84\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/th-a.com\/en\/final-steps\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"TH Arquitectos | Tarragona H\u00f6hne Architekten Mallorca - Arquitectura Mallorca\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"FINAL STEPS - TH Arquitectos | Tarragona H\u00f6hne Architekten Mallorca\" \/>\n\t\t<meta property=\"og:description\" content=\"Final Steps in the Construction Process From Reception to Registration in the Land Registry With the completion of construction, the most important phase has been achieved, but before the new house in Mallorca can be officially occupied, several administrative and legal procedures must be completed. These ensure not only the legality of use but also\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/th-a.com\/en\/final-steps\/\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2025-09-15T16:52:04+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2025-10-16T18:04:51+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"FINAL STEPS - TH Arquitectos | Tarragona H\u00f6hne Architekten Mallorca\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Final Steps in the Construction Process From Reception to Registration in the Land Registry With the completion of construction, the most important phase has been achieved, but before the new house in Mallorca can be officially occupied, several administrative and legal procedures must be completed. These ensure not only the legality of use but also\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/th-a.com\\\/en\\\/final-steps\\\/#blogposting\",\"name\":\"FINAL STEPS - TH Arquitectos | Tarragona H\\u00f6hne Architekten Mallorca\",\"headline\":\"FINAL STEPS\",\"author\":{\"@id\":\"https:\\\/\\\/th-a.com\\\/en\\\/author\\\/jotaele84\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/th-a.com\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/th-a.com\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/07.-building-licence-mallorca-tarragona-hohne-architects.jpg-1536x512-1.jpg\",\"width\":1536,\"height\":512},\"datePublished\":\"2025-09-15T16:52:04+00:00\",\"dateModified\":\"2025-10-16T18:04:51+00:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/th-a.com\\\/en\\\/final-steps\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/th-a.com\\\/en\\\/final-steps\\\/#webpage\"},\"articleSection\":\"ADMINISTRATIVE PROCEDURES, Opcional\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/th-a.com\\\/en\\\/final-steps\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/th-a.com\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Inicio\",\"item\":\"https:\\\/\\\/th-a.com\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/th-a.com\\\/en\\\/category\\\/administrative-procedures\\\/#listItem\",\"name\":\"ADMINISTRATIVE PROCEDURES\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/th-a.com\\\/en\\\/category\\\/administrative-procedures\\\/#listItem\",\"position\":2,\"name\":\"ADMINISTRATIVE PROCEDURES\",\"item\":\"https:\\\/\\\/th-a.com\\\/en\\\/category\\\/administrative-procedures\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/th-a.com\\\/en\\\/final-steps\\\/#listItem\",\"name\":\"FINAL STEPS\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/th-a.com\\\/en\\\/#listItem\",\"name\":\"Inicio\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/th-a.com\\\/en\\\/final-steps\\\/#listItem\",\"position\":3,\"name\":\"FINAL STEPS\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/th-a.com\\\/en\\\/category\\\/administrative-procedures\\\/#listItem\",\"name\":\"ADMINISTRATIVE PROCEDURES\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/th-a.com\\\/en\\\/#organization\",\"name\":\"DICAES\",\"description\":\"Arquitectura Mallorca\",\"url\":\"https:\\\/\\\/th-a.com\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/th-a.com\\\/en\\\/author\\\/jotaele84\\\/#author\",\"url\":\"https:\\\/\\\/th-a.com\\\/en\\\/author\\\/jotaele84\\\/\",\"name\":\"jotaele84\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/th-a.com\\\/en\\\/final-steps\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4661326c52e957ee025d3810c0f738108272d188a274f4822d5d6a5d50e71ee3?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"jotaele84\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/th-a.com\\\/en\\\/final-steps\\\/#webpage\",\"url\":\"https:\\\/\\\/th-a.com\\\/en\\\/final-steps\\\/\",\"name\":\"FINAL STEPS - TH Arquitectos | Tarragona H\\u00f6hne Architekten Mallorca\",\"description\":\"Final Steps in the Construction Process From Reception to Registration in the Land Registry With the completion of construction, the most important phase has been achieved, but before the new house in Mallorca can be officially occupied, several administrative and legal procedures must be completed. These ensure not only the legality of use but also\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/th-a.com\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/th-a.com\\\/en\\\/final-steps\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/th-a.com\\\/en\\\/author\\\/jotaele84\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/th-a.com\\\/en\\\/author\\\/jotaele84\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/th-a.com\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/07.-building-licence-mallorca-tarragona-hohne-architects.jpg-1536x512-1.jpg\",\"@id\":\"https:\\\/\\\/th-a.com\\\/en\\\/final-steps\\\/#mainImage\",\"width\":1536,\"height\":512},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/th-a.com\\\/en\\\/final-steps\\\/#mainImage\"},\"datePublished\":\"2025-09-15T16:52:04+00:00\",\"dateModified\":\"2025-10-16T18:04:51+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/th-a.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/th-a.com\\\/en\\\/\",\"name\":\"DICAES\",\"description\":\"Arquitectura Mallorca\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/th-a.com\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"FINAL STEPS - TH Arquitectos | Tarragona H\u00f6hne Architekten Mallorca","description":"Final Steps in the Construction Process From Reception to Registration in the Land Registry With the completion of construction, the most important phase has been achieved, but before the new house in Mallorca can be officially occupied, several administrative and legal procedures must be completed. These ensure not only the legality of use but also","canonical_url":"https:\/\/th-a.com\/en\/final-steps\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/th-a.com\/en\/final-steps\/#blogposting","name":"FINAL STEPS - TH Arquitectos | Tarragona H\u00f6hne Architekten Mallorca","headline":"FINAL STEPS","author":{"@id":"https:\/\/th-a.com\/en\/author\/jotaele84\/#author"},"publisher":{"@id":"https:\/\/th-a.com\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/th-a.com\/wp-content\/uploads\/2025\/09\/07.-building-licence-mallorca-tarragona-hohne-architects.jpg-1536x512-1.jpg","width":1536,"height":512},"datePublished":"2025-09-15T16:52:04+00:00","dateModified":"2025-10-16T18:04:51+00:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/th-a.com\/en\/final-steps\/#webpage"},"isPartOf":{"@id":"https:\/\/th-a.com\/en\/final-steps\/#webpage"},"articleSection":"ADMINISTRATIVE PROCEDURES, Opcional"},{"@type":"BreadcrumbList","@id":"https:\/\/th-a.com\/en\/final-steps\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/th-a.com\/en\/#listItem","position":1,"name":"Inicio","item":"https:\/\/th-a.com\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/th-a.com\/en\/category\/administrative-procedures\/#listItem","name":"ADMINISTRATIVE PROCEDURES"}},{"@type":"ListItem","@id":"https:\/\/th-a.com\/en\/category\/administrative-procedures\/#listItem","position":2,"name":"ADMINISTRATIVE PROCEDURES","item":"https:\/\/th-a.com\/en\/category\/administrative-procedures\/","nextItem":{"@type":"ListItem","@id":"https:\/\/th-a.com\/en\/final-steps\/#listItem","name":"FINAL STEPS"},"previousItem":{"@type":"ListItem","@id":"https:\/\/th-a.com\/en\/#listItem","name":"Inicio"}},{"@type":"ListItem","@id":"https:\/\/th-a.com\/en\/final-steps\/#listItem","position":3,"name":"FINAL STEPS","previousItem":{"@type":"ListItem","@id":"https:\/\/th-a.com\/en\/category\/administrative-procedures\/#listItem","name":"ADMINISTRATIVE PROCEDURES"}}]},{"@type":"Organization","@id":"https:\/\/th-a.com\/en\/#organization","name":"DICAES","description":"Arquitectura Mallorca","url":"https:\/\/th-a.com\/en\/"},{"@type":"Person","@id":"https:\/\/th-a.com\/en\/author\/jotaele84\/#author","url":"https:\/\/th-a.com\/en\/author\/jotaele84\/","name":"jotaele84","image":{"@type":"ImageObject","@id":"https:\/\/th-a.com\/en\/final-steps\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/4661326c52e957ee025d3810c0f738108272d188a274f4822d5d6a5d50e71ee3?s=96&d=mm&r=g","width":96,"height":96,"caption":"jotaele84"}},{"@type":"WebPage","@id":"https:\/\/th-a.com\/en\/final-steps\/#webpage","url":"https:\/\/th-a.com\/en\/final-steps\/","name":"FINAL STEPS - TH Arquitectos | Tarragona H\u00f6hne Architekten Mallorca","description":"Final Steps in the Construction Process From Reception to Registration in the Land Registry With the completion of construction, the most important phase has been achieved, but before the new house in Mallorca can be officially occupied, several administrative and legal procedures must be completed. These ensure not only the legality of use but also","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/th-a.com\/en\/#website"},"breadcrumb":{"@id":"https:\/\/th-a.com\/en\/final-steps\/#breadcrumblist"},"author":{"@id":"https:\/\/th-a.com\/en\/author\/jotaele84\/#author"},"creator":{"@id":"https:\/\/th-a.com\/en\/author\/jotaele84\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/th-a.com\/wp-content\/uploads\/2025\/09\/07.-building-licence-mallorca-tarragona-hohne-architects.jpg-1536x512-1.jpg","@id":"https:\/\/th-a.com\/en\/final-steps\/#mainImage","width":1536,"height":512},"primaryImageOfPage":{"@id":"https:\/\/th-a.com\/en\/final-steps\/#mainImage"},"datePublished":"2025-09-15T16:52:04+00:00","dateModified":"2025-10-16T18:04:51+00:00"},{"@type":"WebSite","@id":"https:\/\/th-a.com\/en\/#website","url":"https:\/\/th-a.com\/en\/","name":"DICAES","description":"Arquitectura Mallorca","inLanguage":"en-US","publisher":{"@id":"https:\/\/th-a.com\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"TH Arquitectos | Tarragona H\u00f6hne Architekten Mallorca - Arquitectura Mallorca","og:type":"article","og:title":"FINAL STEPS - TH Arquitectos | Tarragona H\u00f6hne Architekten Mallorca","og:description":"Final Steps in the Construction Process From Reception to Registration in the Land Registry With the completion of construction, the most important phase has been achieved, but before the new house in Mallorca can be officially occupied, several administrative and legal procedures must be completed. These ensure not only the legality of use but also","og:url":"https:\/\/th-a.com\/en\/final-steps\/","article:published_time":"2025-09-15T16:52:04+00:00","article:modified_time":"2025-10-16T18:04:51+00:00","twitter:card":"summary_large_image","twitter:title":"FINAL STEPS - TH Arquitectos | Tarragona H\u00f6hne Architekten Mallorca","twitter:description":"Final Steps in the Construction Process From Reception to Registration in the Land Registry With the completion of construction, the most important phase has been achieved, but before the new house in Mallorca can be officially occupied, several administrative and legal procedures must be completed. These ensure not only the legality of use but also"},"aioseo_meta_data":{"post_id":"9385","title":null,"description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":{"faqs":[],"keyPoints":[],"titles":[],"descriptions":[],"socialPosts":{"email":[],"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"created":"2025-10-15 20:10:37","updated":"2025-10-16 18:13:07","seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/th-a.com\/en\/\" title=\"Inicio\">Inicio<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/th-a.com\/en\/category\/administrative-procedures\/\" title=\"ADMINISTRATIVE PROCEDURES\">ADMINISTRATIVE PROCEDURES<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tFINAL STEPS\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Inicio","link":"https:\/\/th-a.com\/en\/"},{"label":"ADMINISTRATIVE PROCEDURES","link":"https:\/\/th-a.com\/en\/category\/administrative-procedures\/"},{"label":"FINAL STEPS","link":"https:\/\/th-a.com\/en\/final-steps\/"}],"_links":{"self":[{"href":"https:\/\/th-a.com\/en\/wp-json\/wp\/v2\/posts\/9385","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/th-a.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/th-a.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/th-a.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/th-a.com\/en\/wp-json\/wp\/v2\/comments?post=9385"}],"version-history":[{"count":1,"href":"https:\/\/th-a.com\/en\/wp-json\/wp\/v2\/posts\/9385\/revisions"}],"predecessor-version":[{"id":9564,"href":"https:\/\/th-a.com\/en\/wp-json\/wp\/v2\/posts\/9385\/revisions\/9564"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/th-a.com\/en\/wp-json\/wp\/v2\/media\/8154"}],"wp:attachment":[{"href":"https:\/\/th-a.com\/en\/wp-json\/wp\/v2\/media?parent=9385"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/th-a.com\/en\/wp-json\/wp\/v2\/categories?post=9385"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/th-a.com\/en\/wp-json\/wp\/v2\/tags?post=9385"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}