{"id":9402,"date":"2025-09-15T16:33:47","date_gmt":"2025-09-15T16:33:47","guid":{"rendered":"https:\/\/th-a.com\/zeit\/"},"modified":"2025-10-16T19:11:52","modified_gmt":"2025-10-16T19:11:52","slug":"zeit","status":"publish","type":"post","link":"https:\/\/th-a.com\/en\/zeit\/","title":{"rendered":"ZEIT"},"content":{"rendered":"<h1><strong>Project Timeline \u2013 From Plot Purchase to Land Registry<\/strong><\/h1>\n<h2>How Long Does It Really Take to Build a House in Mallorca?<\/h2>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"postimg alignnone wp-image-9162 size-full\" src=\"https:\/\/th-a.com\/wp-content\/uploads\/2025\/09\/14-construction-time-mallorca-tarragona-hohne-architects.jpg-1536x512-1.jpg\" alt=\"\" width=\"1920\" height=\"640\" \/><\/p>\n<p>When building a house in Mallorca, it is essential to consider not only the available budget but also a realistic time schedule. Between acquiring the plot and registering the completed house in the <strong>Registro de la Propiedad (Land Registry)<\/strong>, several administrative and construction phases take place, with timeframes that may vary significantly depending on the municipality, the scope of the project, and the required <em>informes sectoriales (sectoral reports)<\/em>.<\/p>\n<ol>\n<li><strong> Preliminary Design, Basic Project and Urban Planning Licence Application \u2013 The Most Important Phase<\/strong><\/li>\n<\/ol>\n<p>In this first stage, the programme of requirements is defined, the potential of the plot is analysed, and the architectural concept is developed. This includes a 3D model of the project integrated into the topography, renderings, and of course floor plans, sections, and elevations.<\/p>\n<p>On this basis, the <strong>Proyecto B\u00e1sico (Basic Project)<\/strong> is prepared and submitted to the town hall to obtain the <strong>Licencia Urban\u00edstica (Urban Planning Permit)<\/strong>.<\/p>\n<p><strong>Approximate duration:<\/strong> 2 to 5 months, depending on project complexity.<\/p>\n<ol start=\"2\">\n<li><strong> The Variable Factor: The Urban Planning Licence<\/strong><\/li>\n<\/ol>\n<p>The time between submission of the Basic Project and the granting of the Urban Planning Licence is the most unpredictable element of the schedule.<\/p>\n<ul>\n<li><strong>Theoretical legal timeframe (legal fiction):<\/strong> 3 months.<\/li>\n<li><strong>Reality:<\/strong> in efficient municipalities, around 6 months; in others, up to 2 years.<\/li>\n<li><strong>Delay factors:<\/strong> the need for <em>informes sectoriales<\/em> from authorities such as Coastal Protection, Roads, or Water Resources.<\/li>\n<\/ul>\n<ol start=\"3\">\n<li><strong> Deadlines for Starting and Completing Works<\/strong><\/li>\n<\/ol>\n<p>Once the Urban Planning Licence is granted, the Execution Project must be submitted together with the designation of the building agents within a maximum of 6 months.<\/p>\n<p>The period allowed for execution after the Urban Planning Licence is 24 or 36 months, depending on the municipality. In <strong>Calvi\u00e0<\/strong>, for example, 36 months are allowed due to summer noise restrictions.<\/p>\n<p>If the deadline is exceeded, an extension may be requested, but the <strong>ICO tax (Impuesto de Construcciones, Instalaciones y Obras)<\/strong> must be paid again for any remaining works.<\/p>\n<ol start=\"4\">\n<li><strong> Licencia de Obra \u2013 Faster, But Not Immediate<\/strong><\/li>\n<\/ol>\n<p>Once the Urban Planning Licence has been obtained, the <strong>Licencia de Obra (Building Licence)<\/strong> may be requested:<\/p>\n<ul>\n<li>Requires the <strong>Proyecto de Ejecuci\u00f3n (Execution Project)<\/strong> stamped by the <strong>COAIB \u2013 Colegio Oficial de Arquitectos de las Islas Baleares<\/strong>, with a timeframe of 1\u20132 weeks for stamping.<\/li>\n<li>If the documentation is complete, authorisation is usually quick; in some municipalities submission is sufficient, while others issue a formal resolution.<\/li>\n<li>As a general rule, works may begin approximately 4 weeks after submission, even through the legal fiction of <em>silencio administrativo<\/em>, which applies after one month.<\/li>\n<\/ul>\n<ol start=\"5\">\n<li><strong> Execution Project and Construction Phase<\/strong><\/li>\n<\/ol>\n<p>Time waiting for the Urban Planning Licence can be used to prepare the Execution Project, especially structural calculations, so that this stage does not extend the overall schedule.<\/p>\n<p>The duration of construction depends on the size and complexity of the project and on the conditions of the site:<\/p>\n<ul>\n<li>In general, 18 months are calculated from start to the <strong>Certificado Final de Obra (Final Works Certificate)<\/strong>.<\/li>\n<li>Complex excavations, detailed construction features, or long delivery times for equipment may extend the duration.<\/li>\n<li><strong>Seasonal restrictions:<\/strong>\n<ul>\n<li>In <strong>Calvi\u00e0<\/strong>, strict noise restrictions apply from May to October; hydraulic hammer excavations are not feasible in most areas, so almost all projects start in autumn.<\/li>\n<li>In <strong>Andratx, Son Vida<\/strong>, and other municipalities, noise restrictions apply in July and August.<\/li>\n<li>Traditionally, many construction companies close in August, although in recent years some have continued activity.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<ol start=\"6\">\n<li><strong> Final Phase \u2013 First Occupancy Licence and Land Registry Entry<\/strong><\/li>\n<\/ol>\n<p>At the end of the works, the <strong>Licencia de Primera Ocupaci\u00f3n (First Occupancy Licence)<\/strong> must be applied for, which legally authorises the use of the dwelling.<\/p>\n<p><strong>Requirements:<\/strong><\/p>\n<ul>\n<li>Certificado Final de Obra (CFO).<\/li>\n<li>Technical certificates for installations and energy performance.<\/li>\n<li><em>As built<\/em> drawings.<\/li>\n<li>Inspection and approval by the municipal architect.<\/li>\n<\/ul>\n<p><strong>Duration:<\/strong> varies widely depending on the municipality, from a few weeks to several months.<\/p>\n<p>Only after this stage can the property be registered in the <strong>Registro de la Propiedad (Land Registry)<\/strong>, a step essential, for example, for a future sale. The registry entry adds several additional weeks to the schedule.<\/p>\n<ol start=\"7\">\n<li><strong> Moving In<\/strong><\/li>\n<\/ol>\n<p>It is advisable to allow for a transition period between completion of the works and the actual move-in date, dedicated to finishing touches or possible adjustments. Even if these are not required, having this margin facilitates decoration, furnishing, and personalisation of the house without time pressure.<\/p>\n<p><strong>Recommendation for Developers<\/strong><\/p>\n<p>Those who understand the different phases and their timeframes from the outset avoid frustration.<\/p>\n<p>An experienced architect will plan realistically, taking into account:<\/p>\n<ul>\n<li>The likely duration of each administrative phase.<\/li>\n<li>Possible <em>informes sectoriales (sectoral reports)<\/em>.<\/li>\n<li>Local restrictions on construction schedules.<\/li>\n<li>The coordination between design, administration, and contractor.<\/li>\n<\/ul>\n<p><strong>Conclusion<\/strong><\/p>\n<p>Between the purchase of the plot and the registration of the completed house in the <strong>Registro de la Propiedad (Land Registry)<\/strong>, the process in Mallorca takes a minimum of two years.<\/p>\n<p>With early planning, good coordination, and an experienced team, this timeframe can be optimised and managed with confidence.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Project Timeline \u2013 From Plot Purchase to Land Registry How Long Does It Really Take to Build a House in Mallorca? When building a house in Mallorca, it is essential&#8230;<\/p>\n","protected":false},"author":1,"featured_media":8187,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[47],"tags":[],"class_list":{"0":"post-9402","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-strategic-decisions"},"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/th-a.com\/en\/wp-json\/wp\/v2\/posts\/9402","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/th-a.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/th-a.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/th-a.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/th-a.com\/en\/wp-json\/wp\/v2\/comments?post=9402"}],"version-history":[{"count":1,"href":"https:\/\/th-a.com\/en\/wp-json\/wp\/v2\/posts\/9402\/revisions"}],"predecessor-version":[{"id":9594,"href":"https:\/\/th-a.com\/en\/wp-json\/wp\/v2\/posts\/9402\/revisions\/9594"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/th-a.com\/en\/wp-json\/wp\/v2\/media\/8187"}],"wp:attachment":[{"href":"https:\/\/th-a.com\/en\/wp-json\/wp\/v2\/media?parent=9402"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/th-a.com\/en\/wp-json\/wp\/v2\/categories?post=9402"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/th-a.com\/en\/wp-json\/wp\/v2\/tags?post=9402"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}